Skip to main content
Works phase services

Works phase services

Works phase services

The support of the engineering departments is also a key factor during execution of the works, both to conduct supervision and check compliance with the stipulations set in the design phase but also to perform office work and provide technical support to the construction companies. Antea Group Spain & Latin America’s team of qualified experts places its experience and knowledge at the disposal of the client when seeking the technical solutions and organizational methods to maximize the creation of added value.

Featured projects

alt-text

Panama

SUPERVISION OF CONSTRUCTION OF THE LA MITRA DISTRIBUTION NETWORK, CHORRERA (PANAMA). 7,3 KM OF NETWORK ǀ INVESTMENT: 3.200.000 USD – 2015.
alt-text

Panama

MANAGEMENT, ADMINISTRATION, COORDINATION AND TECHNICAL INSPECTION ASSISTANCE SERVICES FOR THE HOWARD WATER TREATMENT PLANT PROJECT, ARRAIJÁN DISTRICT, PROVINCE OF PANAMA WEST (PANAMA). 4,5 KM NETWORK ǀ 1,75 M3/S ǀ 248.000 INHABITANTS ǀ INVESTMENT: 211 MM USD – 2021.
alt-text

Spain

TECHNICAL ASSISTANCE TO WORKS MANAGEMENT FOR CONTROL AND MONITORING OF THE COMPLEMENTARY WORKS FOR CONDITIONING THE GENERAL COLLECTORS OF THE MIÑO RIVER IN LUGO (SPAIN). MAXIMUM DIAMETER 1.200 MM ǀ INVESTMENT: 738.864 € - 1.059.000 USD - 2009.
alt-text

Panama

TECHNICAL SUPERVISION AND INSPECTION OF THE DESIGN AND CON¬STRUCTION PLANS OF THE SEWAGE SYSTEM OF LA PINTADA, COCLÉ (PANAMA). 9,4 KM OF NETWORK ǀ INVESTMENT: 4.000.000 USD - 2013.
alt-text

Spain

WORKS MANAGEMENT, SUPPLY AND INSTALLATION OF A BLACK AND INDUSTRIAL WATER TREATMENT PLANT AT THE ALCOA-INESPAL FACTORY IN A CORUÑA (SPAIN).
alt-text

Spain

INSPECTION AND SURVEILLANCE OF THE FACILITIES, SERVICES AND OPERATIONS FOR THE OUTER PORT OF FERROL - A CORUÑA (SPAIN). 11 KM TO WATER SUPPLY NETWORK CONNECTION ǀ 700 MM DIAMETER ǀ INVESTMENT: 13 MM € -17 MM USD – 2012.
alt-text

Spain

MANAGEMENT OF URBAN DEVELOPMENT OF THE MUROS INDUSTRIAL ESTATE (A CORUÑA). 1,4 KM COLLECTORS ǀ 3,2 KM SUPPLY AND IRRIGATION PIPING ǀ WWTP WITH AVERAGE FLOW OF 13,7 M3/H ǀ INVESTMENT: 5.336.000 € - 7.000.000 USD – 2006.