Skip to main content
Planning and feasibility

Planning and feasibility

Planning and feasibility

Planning is choosing the future. The rational use of public resources requires a prior reflection that leads to definition of both the inter­ventions to be carried out and the origin of the required resources. Antea Group Spain & Latin America has been successfully providing studies for public works and comprehensive structuring of PPP projects for more than 35 years.

Private initiatives and financers also require exhaustive analyses that assess the risk level of their investment by taking the entire range of factors and stakeholders that will influence the project throughout its life cycle into account.

Featured projects

alt-text

Colombia

INTEGRATED TECHNICAL, ADMINISTRATIVE, SOCIAL, LAND, ENVIRONMENTAL, FINANCIAL, ACCOUNTING AND LEGAL STRUCTURING FOR THE PPP PUBLIC INITIATIVE PROJECT FOR A NEW ROAD NETWORK IN THE VALLE DEL CAUCA, ACCESS CORRIDORS TO CALI AND PALMIRA (COLOMBIA). 310 KM │ 15,8 KM NEW ROADS │ CAPEX 1,22 BB COP (310 MM USD) │ OPEX 1,80 BB COP (460 MM USD).
alt-text

Uruguay

TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDY OF THE TRANSPORT AND LOGISTICS INFRASTRUCTURE FOR ROAD ACCESS TO THE PORT AREA OF MONTEVIDEO (URUGUAY). 37 KM URBAN ROADS ǀ 5,8 KM VIADUCTS ǀ 1,6 KM TUNNELS ǀ INVESTMENT: 634 MM USD - 2015.
alt-text

Mexico

STRUCTURING STUDIES FOR IMPLEMENTATION OF THE PPP FOR REFURBISHMENT AND CONSERVATION OF A TOLL-FREE HIGHWAY LOCATED IN TEJUPILCO, IXTAPAN AND TOLUCA (MEXICO). 1.637 KM ǀ 82 ROUTES ǀ INVESTMENT: 13.629 MM MXN - 722 MM USD - 2019.
alt-text

Colombia

SPECIALIST CONSULTANCY FOR THE UPDATING, COMPLEMENTATION AND VALIDATION OF THE STUDIES AND DESIGNS AT THE LEVEL OF FEASIBILITY, FOR THE INTEGRATED STRUCTURING OF THE CORRIDOR BOGOTÁ-VILLETA-EL KORÁN AND GUADUAS-PUERTO BOGOTÁ (COLOMBIA). 221 KM EXISTING NETWORK │ 18 KM GREENFIELD │ 8 TUNNELS OF 11 KM │ 24 BRIDGES │ ITS │ INVESTMENT OF CAPEX: 3 BB COP (773 MM USD) │ OPEX: 2,5 BB COP (635 MM USD) OVER 30 YEARS.
alt-text

Spain

INFORMATIVE STUDY OF THE LINK HIGHWAY WITH THE A8 BETWEEN SAN CIBRAO AND BARREIROS (SPAIN). 33,5 KM ǀ 5 JUNCTIONS ǀ 3 KM OF VIADUCT ǀ INVESTMENT: 258 MM € - 379 MM USD – 2007.
alt-text

Spain

REGIONAL ROAD PLAN FOR CASTILLA Y LEÓN (SPAIN). 11.311 KM (2.589 KM BASIC NETWORK – 4.493 KM COMPLEMENTARY PREFERENTIAL NETWORK – 4.228 KM COMPLEMENTARY LOCAL NETWORK).
alt-text

Spain

PRELIMINARY DRAFT OF THE CARBALLO-FINISTERRE HIGH-CAPACITY HIGHWAY (SPAIN). 57.56 KM ǀ 12 VIADUCTS ǀ 20 JUNCTIONS ǀ INVESTMENT: 110 MM € - 120 MM USD - 2005.
alt-text

Colombia

PRE-FEASIBILITY STUDIES FOR CONNECTION OF THE EAST-WEST SYSTEM UNDER THE OLAYA HERRERA AIRPORT IN THE MEDELLÍN MUNICIPAL DISTRICT (COLOMBIA). 3 KM ǀ 2 KM TUNNEL ǀ INVESTMENT: 759.061 MM COP - 253 MM USD - 2017.
alt-text

Colombia

SPECIALIST CONSULTANCY FOR EXECUTION OF THE INTEGRATED TECHNICAL, LEGAL AND FINANCIAL STRUCTURING OF THE PROJECT KNOWN AS GROUP 2 CENTER WEST, 4G HIGHWAY CORRIDORS: DIVIDED HIGHWAY ÍBAGUE – LA PAILA; DIVIDED HIGHWAY BUGA- BUENAVENTURA AND SANTANDER DE QUILICHAO - CHACHAGÜI - PASTO – RUMICHACA (COLOMBIA). 791 KM ǀ INVESTMENT: 15.800.000 MM COP – 5.214 MM USD - 2016.