Skip to main content
Data collection

Data collection

Data collection

The project baseline data constitute the basic working material that determines not only its degree of detail but also its quality. As a general rule, the greater the quantity of data available, the easier it is to conduct a deep and accurate analysis of the behavior of the parameter or field of interest. That’s why data collection is a key factor for Antea Group Spain & Latin America - and in particular for the Mobility Management Business Unit - when the company undertakes a trans­port infrastructure management project.

 

Featured projects

alt-text

Colombia

COLLECTION AND ANALYSIS OF TRANSIT DATA WITH VERIFIABLE TECHNOLOGY ON THE NATIONAL ROAD NETWORK (COLOMBIA). 26 DEPARTMENTS ǀ 478 GAUGING STATIONS ǀ 18.000 HOURS OF SMART VIDEO PROCESSING.
alt-text

Spain

INSTALLATION, MAINTENANCE AND OPERATION OF THE TRAFFIC GAUGING STATIONS IN THE REGIONAL NETWORK OF GALICIA (SPAIN). 5.546 KM MONITORED ǀ 238 FIXED GAUGING STATIONS ǀ 146 PNEUMATIC GAUGING STATIONS ǀ 31 MILLION DATA LOGGED.
alt-text

Spain

CYCLING GAUGES AND PEDESTRIAN COUNTS USING VARIOUS TECHNOLOGIES (PNEUMATIC GAUGES, BLUETOOTH, DRONES, ARTIFICIAL INTELLIGENCE, ETC.) TO CONDUCT TRAFFIC STUDIES IN THE REGIONAL NETWORK OF GALICIA (SPAIN). 6 HOURS OF RECORDING BY DRONE ǀ OVER 10.000 DATA PROCESSED USING AI.
alt-text

Spain

IN SITU VERIFICATION OF THE ROUTES TAKEN BY INTERURBAN TRANSPORT LINES TO DRAW UP INTERURBAN TRANSPORT ACCESSIBILITY PLANS IN THE URBAN CENTER OF THE CITIES OF A CORUÑA, OURENSE, PONTEVEDRA AND VIGO WITHIN THE FRAMEWORK OF THE METROPOLITAN TRANSPORT PLAN OF GALICIA (SPAIN). 3 MILLION PASSENGERS ǀ 9,9 MILLION DATA LOGGED ON ORACLE DB ǀ 35 CONCESSIONAIRES ǀ GIS DEVELOPMENT OF THE TRANSPORT NETWORK.
alt-text

Spain

SPEED MEASUREMENTS FOR STUDY OF ACCIDENT CONCENTRATION SECTIONS ON THE N-550 HIGHWAY IN PONTEVEDRA (SPAIN). 1.200 DATA LOGGED ǀ 3 DETECTION POINTS ǀ 1,5 KM STUDIED.
alt-text

Spain

VEHICLE COUNTING USING PNEUMATIC GAUGES FOR THE STUDY OF TRAFFIC BEHAVIOR USING MICRO-SIMULATION TOOLS AT THE INTERSECTION OF RONDA DA MURALLA WITH AVENIDA DE A CORUÑA IN LUGO (SPAIN). 6 PNEUMATIC GAUGES ǀ 4 TRAFFIC LIGHT CYCLES ǀ MORE THAN 1.000 HOURS MONITORED.