Spain
INTEGRATED EXECUTION MANAGEMENT FOR THE NEW PORT FACILITIES AT THE OUTER HARBOR OF FERROL (SPAIN). 1.067 M SEAWALL ǀ 89,3 HA ǀ 20 M MINIMUM DRAFT ǀ INVESTMENT: 134 MM € - 160 MM USD - 2005.
Engineering support is key during the construction work, both for supervision to verify compliance with the prescriptions of the design phase, and for office work and technical support to the construction companies.
The experience built up in planning and structuring coastal and maritime infrastructure, and the design experience at the level of detail engineering, mean that the teams of Antea Group Spain & Latin America are able to set out the full picture to Clients, in the joint quest for technical and organizational solutions directed at maximizing the added value generated.