Skip to main content
Design

Design

Design

The proper application of design techniques in designing sustainable projects promotes the energy efficiency of the building and the consequent savings of material and financial resources; studying the territorial and climatic setting of each place to be inhabited guides us in taking decisions on how and where to position the building.

Antea Group Spain & Latin America drafts sustainable projects that seek to meet the environmental comfort needs of the building with the optimal use of natural sources of energy (solar heat and light, prevailing winds, water resources) and protection against aggressive or unhealthy agents, while always heeding the cost, schedule and quality objectives set by the Client.

Featured projects

alt-text

Spain

BASIC AND EXECUTION PROJECT FOR THE NEW COURT BUILDING IN PONTEVEDRA (SPAIN). 21.367 M2 IN 2 BASEMENT LEVELS AND 6 ABOVE GROUND ǀ INVESTMENT: 20 MM € - 27,5 MM USD – 2013.
alt-text

Spain

EXECUTION PROJECT AND SHARED SITE MANAGEMENT FOR 40 BREEAM BIOCLIMATIC INDUSTRIAL SHEDS, IN THE PORTO DO MOLLE BUSINESS PARK IN NIGRÁN, PONTEVEDRA (SPAIN). 57.726 M2 BUILT ǀ INVESTMENT: 33,9 MM € - 43,9 MM USD – 2011.
alt-text

Colombia

GENERAL DIAGNOSIS OF INFRASTRUCTURE, COMPLEMENTARY DESIGNS AND MANAGEMENT AND SUPERVISION OF WORKS FOR COMPLETION OF A 2000-M2 BUILDING IN THE CITY OF CARTAGENA (COLOMBIA). INVESTMENT: 5.895 MM COP - 1,7 MM USD – 2019.
alt-text

Panama

DRAFTING OF PLANS AND TECHNICAL REPORTS FOR CONS¬TRUCTION OF THE BASILO LAKAS CORRECTIONAL CENTER IN MARIA CHIQUITA, PROVINCE OF COLÓN (PANAMA). CAPACITY: 72 YOUNG OFFENDERS ǀ PLOT: 40.000 M2 ǀ BUILDINGS: 4.238 M2 ǀ INVESTMENT: 4,5 MILLION USD - 2017.
alt-text

Panama

ARCHITECTURAL DESIGNS OF THE CONTROL, ADMINISTRA¬TION, PLANT PERSONNEL AND INDUSTRIAL BUILDINGS TO HOUSE THE TREATMENT EQUIPMENT OF THE ARRAIJÁN ESTE WATER TREATMENT PLANT (WWTP). 5.000 M2 BUILDINGS.
alt-text

Mexico

STRUCTURAL STUDY, HYDROLOGICAL STUDY AND DRAINAGE CONSTRUCTION PROJECT IN BUILDING THE DOCUMENT MANAGEMENT AND DIGITALIZATION CENTER FOR THE FEDERAL JUDICIARY COUNCIL IN TLAXCALA (MEXICO). 7545 M2 ǀ 622 TN STRUCTURAL STEEL ǀ 148 TN ARMORED STEEL ǀ 31.728 M2 OF BAYS ǀ INVESTMENT: 133 MM MXN - 7 MM USD - 2019.
alt-text

Spain

INTEGRATED MANAGEMENT, PROJECT DRAFTING AND SITE MANAGEMENT FOR THE CAIXA GALICIA FOUNDATION ART COLLECTION STOREHOUSE PROJECT IN THE POCOMACO INDUSTRIAL ESTATE, A CORUÑA (SPAIN). 1.677 M2 BUILT.
alt-text

Panama

STUDIES AND DESIGNS FOR THE REMODELING PROJECT FOR THE ROBERTO KELLY SPORTS COMPLEX IN THE CORREGIMIENTO OF DON BOSCO, PANAMA CITY (PANAMA). 2.600 SPECTATORS │ BUILDING 2.300 M2 │ INVESTMENT: 7,5 MM USD - 2016.
alt-text

Spain

BASIC PROJECT AND EXECUTION OF EQUIPMENT AND MAINTENANCE BUILDING FOR THE CENTRAL GALICIA MOTORWAY AROUND THE RIBADULLA TOLL PLAZA IN VEDRA, A CORUÑA (SPAIN). 869 M2 BUILT │ INVESTMENT: 568.626 € - 713.000 USD – 2003.
alt-text

Spain

PROJECT AND CONSTRUCTION MANAGEMENT FOR A BUILDING FOR GARAGES, COMMERCIAL PREMISES AND DWELLINGS IN PUNTA VICAÑO – SANXENXO, PONTEVEDRA (SPAIN). 2.900 M2 BUILT ǀ 24 DWELLINGS.