Skip to main content
Design

Design

Design

Drawing up detailed design or construction plans requires the precise calculation and design of all components that comprise the physical infrastructure: dirt roads, paving, hydraulic systems and drainage, structures, viaducts, tunnels, safety elements, signaling and markings, etc. Antea Group Spain & Latin America’s work teams have accumulated a large number of international references in this field. The multidisciplinary nature of its qualified experts enables the Group to provide the client with a comprehensive end product that includes the design of components that could be considered unique such as ITS equipment, toll plazas, or tunnel facilities.

The designs we create take the entire life cycle of the infrastructure into account, not only the construction phase but also the operating and maintenance strategies. The BIM methodology is a tool that enables asset management from the design stage, through updating during construction to asset management throughout its entire useful life.

Featured projects

alt-text

Colombia

DETAILED STUDIES AND DESIGNS OF THE PACÍFICO 1 LINK HIGHWAY (COLOMBIA). 50 KM ǀ 52 VIADUCTS TOTALING 6 KM ǀ 2 DUAL TUNNELS TOTALING 5,5 KM ǀ INVESTMENT: 1.779.775 MM COP - 552 MM USD - 2016.
alt-text

Mexico

REVIEW, ADJUSTMENT AND COMPLEMENTS OF THE STUDIES AND CONSTRUCTION PLANS FOR THE ESTACIÓN DON - NAVOJOA (KM 68+900 TO 154+000) AND CIUDAD OBREGÓN - GUAYMAS (KM 0+000 TO 10+000 AND KM 26+100 TO 107+000) HIGHWAY IN THE STATE OF SONORA (MEXICO). 176 KM ǀ 1 JUNCTION ǀ INVESTMENT: 2.324 MM MXN - 112 MM USD - 2016.
alt-text

Uruguay

EXECUTION PLANS OF THE WORKS TO FINE-TUNE THE ROAD INFRASTRUCTURE OF CENTRAL-WEST ROUTE 14, SARANDI DEL YÍ BYPASS AND R14 TO R3 LINK ROAD. CIRCUIT 3. (URUGUAY). 291 KM ǀ 10 NEW BRIDGES TOTALING 1,75 KM ǀ 10 BRIDGES TOTALING 1.3 KM TO BE REFURBISHED ǀ 9 JUNCTIONS ǀ INVESTMENT: 171 MM USD - 2020.
alt-text

Spain

CONSTRUCTION ENGINEERING OF THE VILAMAR -BARREIROS SECTION OF THE A-8 CANTABRIAN MOTORWAY FROM SAN SEBASTIÁN TO SANTIAGO DE COMPOSTELA (SPAIN). 4,46 KM ǀ 1 JUNCTION ǀ 3 VIADUCTS TOTALING 1,55 KM ǀ INVESTMENT: 50 MM € - 59 MM USD - 2005.
alt-text

Panama

DESIGN, CONSTRUCTION AND MAINTENANCE PLANS FOR EXTENSION TO SIX (6) LANES OF THE LAS PLAYAS CORRIDOR ON THE PAN-AMERICAN HIGHWAY, SECTION 1: LA CHORRERA - SANTA CRUZ (PANAMA). 32,75 KM / 3 NEW BRIDGES AND 9 EXTENSIONS / 12 JUNCTIONS / INVESTMENT: 543 MM USD - 2020.
alt-text

Colombia

STUDIES AND DESIGNS FOR THE DIVIDED HIGHWAY CALARCÁ – ARMENIA Y CALARCÁ – LA PAILA IN THE DEPARTMENTS OF QUINDÍO AND VALLE DEL CAUCA (COLOMBIA). 73 KM.
alt-text

Spain

CONSTRUCTION ENGINEERING PLANS TO INCREASE THE CAPACITY OF THE AP-9 HIGHWAY, KP 55 JUNCTION WITH SOUTHERN BRANCH IN A CORUÑA (SPAIN). 2,8 KM ǀ INVESTMENT: 7,3 MM € – 9,6 MM USD - 2010.
alt-text

Colombia

STUDIES AND DESIGNS FOR THE HIGHWAY CORRIDORS LOCATED ALONG ROUTE 6211 SOGAMOSO - EL CRUCERO - AGUAZUL, DEPARTMENTS OF BOYACÁ AND CASANARE (COLOMBIA). BYPASS 13,6 KM CAPEX 239.407 MM COP (60 MM USD) │ SPECIAL ATTENTION TO 16 UNSTABLE ZONES CAPEX 174.929 MM COP (43,9 MM USD).
alt-text

Spain

ROUTING AND CONSTRUCTION PLANS FOR EXTENSION OF THE PASAJE BRIDGE (AC-12 ROAD, PK 4,2 – 4,4), A CORUÑA (SPAIN). 0,6 KM ǀ INVESTMENT: 24 MM € - 27 MM USD - 2020.
alt-text

Mexico

EXECUTION PLANS FOR THE SIGLO XXI HIGHWAY CONCESSION, JANTETELCO - XICATLACOTLA AND JANTETELCO - EL HIGUERÓN SECTION, STATE OF MORELOS (MEXICO). 62 KM ǀ INVESTMENT: 2.677 MM MXN - 140 MM USD - 2017.
alt-text

Spain

CONSTRUCTION ENGINEERING FOR ACCESS ROAD TO THE OUTER PORT OF PUNTA LANGOSTEIRA IN A CORUÑA (SPAIN). 5 KM / 1 JUNCTION / 2 VIADUCTS / INVESTMENT: 66 MM € - 87,4 MM USD – 2010.

Esta página web usa cookies

Seleccione el tipo de cookie que desea aceptar

More information