Skip to main content
Design

Design

Design

Drawing up detailed construction plans requires the precise calcu­lation and design of all components to be executed including those that can be considered unique such as railway superstructures, viaducts, safety facilities and communications. The quality of the projects managed by Antea Group Spain & Latin America ensures its clients the peace of mind of knowing that they are dealing with a fully accredited and highly solvent company.

The designs we create take the entire life cycle of the infrastructure into account, not only the construction phase but also the oper­ating and maintenance strategies. The BIM methodology is a tool that enables asset management from the design stage, through updating during construction to asset management throughout its entire useful life.

Featured projects

alt-text

Portugal

PRELIMINARY STUDY TO UPGRADE RAILWAY CAPACITY ON THE LEIXÕES LINE AND IN THE NEW INTERMODAL TERMINAL IN GRANDE PORTO (PORTUGAL). 17,76 KM ǀ INVESTMENT: 23,75 MM € - 26 MM USD - 2020.
alt-text

Panama

STUDY, DESIGN, CONSTRUCTION AND COMMISSIONING OF THE TOLL PLAZA, ADAPTATION OF CARRIAGEWAYS AND UPGRADE OF PUBLIC SPACES IN THE SAN ISIDRO AREA, OMAR TORRIJOS DISTRICT, SAN MIGUELITO, PANAMA CITY (PANAMA). 100.000 BENEFICIARIES ǀ INVESTMENT: 29 MM USD - 2015.
alt-text

Spain

HIGH SPEED ATLANTIC CORRIDOR CONSTRUCTION PLANS, ORDES - QUEIXAS SECTION (SPAIN). 4 KM ǀ 2 TUNNELS TOTALING 1,25 KM ǀ INVESTMENT: 38 MM € - 52 MM USD - 2004.
alt-text

Mexico

SUPERVISION OF CONSTRUCTION OF FOOTINGS, PILES, COLUMNS AND CAPS AND EARTHWORKS REQUIRED TO COMPLETE SECTIONS 1 AND 9 OF THE ELEVATED VIADUCT, SECTION III OBSERVATORIO, SANTA FE - TUNNEL, OF THE MEXICO - TOLUCA INTERURBAN TRAIN (MEXICO). 60 KM ǀ INVESTMENT: 420 MM MXN - 21 MM USD - 2017.
alt-text

Spain

CONSTRUCTION PLANS FOR THE HIGH-SPEED ATLANTIC CORRIDOR, PONTE DAS CABRAS – FERROL SECTION (SPAIN). 1,86 KM ǀ 2 OVERPASSES ǀ 1 PEDESTRIAN WALKWAY ǀ REFORM OF TRACK HUBS ǀ INVESTMENT: 10,6 MM €- 14 MM USD - 2009.
alt-text

Spain

BETANZOS-FERROL RAILWAY LINE CONSTRUCTION PLANS AND UPGRADE MEASURES (SPAIN). 42,43 KM ǀ 4 TUNNELS TOTALING 1,3 KM ǀ 1 BRIDGE 810-M ǀ INVESTMENT: 941 MM € - 833 MM USD - 2000
alt-text

Spain

CONSTRUCTION PLANS TO PHASE OUT 10 LEVEL CROSSINGS ON THE VENTA DE BAÑOS - SANTANDER LINE AND 2 LEVEL CROSSINGS ON THE VILLABONA-SAN JUAN DE NIEVA LINE (SPAIN). 2 UNDERPASSES ǀ 4 OVERPASSES.
alt-text

Spain

AMENDED CONSTRUCTION PLANS FOR THE HIGH-SPEED ATLANTIC CORRIDOR WORKS, UXES – POCOMACO SECTION (SPAIN). 4,3 KM ǀ 2 TUNNELS TOTALING 2,3 KM ǀ INVESTMENT: 76,5 MM € - 109 MM USD - 2009.
alt-text

Spain

CONSTRUCTION PLANS FOR THE INTERNAL RAILWAY NETWORK AND MODAL EXCHANGE FACILITIES IN THE OUTER PORT OF FERROL (SPAIN). 3 KM ǀ INVESTMENT: 4 MM € – 5,5 MM USD - 2004.

Esta página web usa cookies

Seleccione el tipo de cookie que desea aceptar

More information