Skip to main content
Design

Design

Design

Drawing up detailed construction plans requires the precise calculation and design of all components to be executed including those that can be considered unique, such as works for intakes, tanks, water treatment and water filtration plants, pumping stations, etc.

The quality of the projects managed by Antea Group Spain & Latin America in all phases of the integrated water cycle ensures its clients the peace of mind of knowing that they are dealing with a fully accredited and highly solvent company.

Featured projects

alt-text

Panama

DESIGN, CONSTRUCTION OPERATION AND MAINTENANCE OF THE ARRAIJÁN ESTE WASTEWATER TREATMENT PLANT (WWTP), THE TRUNK SYSTEM AND ITS CONNECTIONS AND OPERATION AND MAINTENANCE OF THE SEWAGE NETWORK OF BURUNGA AND ARRAIJÁN CITY. WWTP CAPACITY 1.00 M3/S YEAR 2.050 HORIZON ǀ 190.000 INHABITANTS ǀ 5.000 M2 OF BUILDINGS ǀ INVESTMENT: 60,5 MM USD - 2019.
alt-text

Panama

STUDIES AND DESIGNS FOR THE “JUAN DÍAZ RIVER BASIN COLLECTORS” PROJECT AND COMPLEMENTARY WORKS OF THE PANAMA CITY AND BAY AREA SEWAGE PROJECT (PANAMA). 21 KM OF CONDUITS ǀ MAXIMUM DIAMETER 72” ǀ INVESTMENT: 55 MM USD - 2016.
alt-text

Spain

UPGRADING AND EXTENSION PROJECT OF THE WASTEWATER TREATMENT PLANT (WWTP) OF A LARACHA, A CORUÑA (SPAIN). 8.000 INHABITANTS ǀ INVESTMENT: 2 MM € - 2,3 MM USD - 2013.
alt-text

Panama

CONSTRUCTION PROJECT OF THE MAIN COLLECTOR, PUMPING STATION AND IMPULSE LINE IN THE CHORRILLO SECTOR (PANAMA). 41.233 INHABITANTS ǀ INVESTMENT: 6 MM USD - 2017.
alt-text

Spain

DRAFTING OF FACILITIES ANNEX IN THE CONSTRUCTION PROJECT OF A CATTLE-RAISING CENTER AT GRANXA GAYOSO-CASTRO, LUGO (SPAIN). 3.000 HEAD OF CATTLE ǀ 28,321 M3/YEAR PURINE TREATMENT STATION ǀ 400 KVA TRANSFORMER CENTER ǀ INVESTMENT: 11 MM € - 12,8 MM USD – 2011.
alt-text

Spain

CONCLUSION TO RIVER BARBAÑA SANITATION PROJECT AND ENHANCEMENT OF THE WASTEWATER TREATMENT PLANT IN SAN CIBRAO DAS VIÑAS, PHASE II, OURENSE (SPAIN). 75 KM MAIN SEWAGE NETWORK ǀ 2 SANITATION NETWORK PUMPS AND 1 DEPOSIT (3.000M3) ǀ WASTEWATER TREATMENT PLANT 1,80 M3/H AVERAGE DAILY FLOW ǀ INVESTMENT: 29,7 MM € - 33,3 MM USD - 2020.
alt-text

Spain

PROJECT TO EXECUTE NATURAL WATER RETENTION MEASURES IN THE SIGNIFICANT POTENTIAL FLOODING RISK AREAS (ARPSIs) ES010-LU-03-01 MONFORTE DE LEMOS (PROVINCE OF LUGO) AND ES010‐OU-01-07 ARNUIDE (PROVINCE OF OURENSE) (SPAIN).
alt-text

Panama

FINAL STUDIES AND DESIGNS FOR THE WORKS AND UPGRADING OF THE AQUEDUCT AND SEWAGE NETWORK OF PANAMA CITY (PANAMA). 100 KM PIPING ǀ 15 TANKS ǀ MAXIMUM DIAMETER 42” ǀ INVESTMENT: 100 MM USD 2016.
alt-text

Spain

PROJECT FOR FACILITIES, SERVICES AND OPERATION OF THE OUTER HARBOR OF FERROL (SPAIN). 17 KM SUPPLY NETWORK ǀ 5 KM RAINWATER NETWORK ǀ 5.5 KM FIREFIGHTING -NETWORK ǀ INVESTIMENT: 28M € - 32MM USD - 2011.

Esta página web usa cookies

Seleccione el tipo de cookie que desea aceptar

More information