Skip to main content
Works phase services

Works phase services

Works phase services

Engineering support is key during the construction work, both for supervision to verify compliance with the prescriptions of the design phase, and for office work and technical support to the construction companies.

The experience built up in planning and structuring coastal and maritime infrastructure, and the design experience at the level of detail engineering, mean that the teams of Antea Group Spain & Latin America are able to set out the full picture to Clients, in the joint quest for technical and organizational solutions directed at maximizing the added value generated.

Featured projects

alt-text

Spain

INTEGRATED EXECUTION MANAGEMENT FOR THE NEW PORT FACILITIES AT THE OUTER HARBOR OF FERROL (SPAIN). 1.067 M SEAWALL ǀ 89,3 HA ǀ 20 M MINIMUM DRAFT ǀ INVESTMENT: 134 MM € - 160 MM USD - 2005.
alt-text

Spain

EXECUTION CONTROL FOR THE CONSTRUCTION WORK FOR THE NEW PORT FACILITIES AT THE OUTER HARBOR OF LANGOSTEIRA IN A CORUÑA (SPAIN). 3.400 M SEAWALL ǀ 231 HA WATER SURFACE ǀ 150 HA ǀ 25 M MINIMUM DRAFT ǀ INVESTMENT: 548 MM € - 709 MM USD - 2011.
alt-text

Spain

EXECUTION CONTROL FOR THE WEST SEAWALL AND RUBBLE MOUND FOR THE ESPLANADE AT THE NEW OUTER HARBOR FACILITIES AT PUNTA LANGOSTEIRA (SPAIN). 887 M SEAWALL ǀ 11 HA ǀ INVESTMENT: 43 MM € - 51 MM USD – 2017.
alt-text

Spain

TECHNICAL ASSISTANCE TO SITE MANAGEMENT FOR THE NEW FISH MARKET IN RIBEIRA (SPAIN). 22.322 M2 ǀ 10.860 M2 PREFABRICATED STRUCTURE ǀ 310 CONCRETE PILES ǀ INVESTMENT: 19,4 MM € - 20,4 MM USD – 2016.
alt-text

Spain

EXECUTION CONTROL FOR THE WORK TO BUILD THE NEW BORDER INSPECTION POST (B.I.P.) AND THE NEW CRUISE LINER TERMINAL IN THE PORT OF A CORUÑA (SPAIN). 1.296 M2 ǀ INVESTMENT: 2,4 MM € - 3,1 MM USD - 2011.
alt-text

Spain

TECHNICAL ASSISTANCE EXECUTION CONTROL FOR PROJECT TO EXPAND THE LANGOSTEIRA DOCK A2-A3 AND CAPITAL DREDGING FOR THE NEW PORT FACILITIES AT PUNTA LANGOSTEIRA, A CORUÑA (SPAIN). 348 M WITH DRAFTS OF 15,35 M, 20,00 M AND 21,85 M ǀ 109.542 M3 DREDGED ǀ INVESTMENT: 20 MM € - 23,8 MM USD – 2021.
alt-text

Spain

SITE MANAGEMENT AND EXECUTION CONTROL FOR THE CONTAINER TERMINAL FACILITIES OF THE COMPANY FERROL CONTAINER TERMINAL (FCT) AT THE OUTER HARBOR OF FERROL (SPAIN). 5 CONTAINER CRANES / 1.000.000 TEU.

Esta página web usa cookies

Seleccione el tipo de cookie que desea aceptar

More information